How Much Is My Villa or LAND Worth?

Our team of experts can help you sell your villa or land. Get a free estimate and consultation on property value and learn more about buying, selling or building.

Get your home estimation

We will get in touch with you as soon as possible.


CASA VIORA

UBUD - bali

IDR 5.000.000.000

Price

15 - 25%

Annual ROI (Est.)

5 - 7 Years

Payback Period

EARLY BIRD OFFER

IDR 4.500.000.000

Property Gallery

3D VIDEO

About the Property

 

Modern Tropical Living in the Heart of Ubud

Tucked away in a serene neighborhood with a 6 meter access road, Casa Viora offers the perfect blend of privacy and convenience, just minutes away from central Ubud.

This beautiful villa features 3 bedrooms and 3.5 bathrooms, an enclosed air conditioned living room, and a spacious rooftop area ideal for relaxing or entertaining. Set on 195 m² of land with a building size of 197 m², it offers a perfect balance of comfort and functionality.

Enjoy the comfort of a private pool, sun deck, and lush tropical garden, creating your own peaceful sanctuary surrounded by nature. The villa is fully furnished with tastefully designed interiors that combine modern comfort and timeless Balinese charm.

Perfectly located in Ubud, offering easy access to
● 10 minutes by car to Ubud Central
● 5 minutes to nearby cafes and restaurants
● 10 minutes to Ubud main attractions and cultural sites

Experience the essence of Ubud living where modern design meets tropical tranquility.

FlOOR PLAN

LOCATION

Development Overview

Follow our construction timeline and key milestones from start to finish

October 15, 2025

Site Preparation &
Early Foundation


Land clearing, leveling, worker housing, electrical setup, and excavation for foundations.

October 15, 2025

November 9, 2025

Foundation &
Structural Columns


Foundation works including reinforcement installation, concrete casting, footplate preparation, and rebar works for sloofs and floor slabs.

November 9, 2025

January 9, 2025

Ground Floor &
First Floor Build


Concrete casting for ground floor columns, beams, and slabs. First floor structure and internal wall construction begins.

January 9, 2025

March 18, 2026

Roofing, Pool, Electrical, and Plumbing


Roof slab and rebar completion. Swimming pool excavation and concrete casting. Start of plastering, electrical, and plumbing rough-ins.

March 18, 2026

August 9, 2026

Finishes & Fixtures


Floor tiles, bathroom installation, carpentry, paintwork, interior/exterior textures, and installation of doors, windows, and lighting.

August 9, 2026

Sep 18, 2026

Final Touches &
Handover


Landscaping, pool finishing, and outdoor paving. AC, water heater, and appliance installation. Final inspections, deep cleaning, and staging for handover. Estimated Completion: September 2026.

Sep 18, 2026
Contact

Do you want to know more?

Let’s get answered all your open questions. Text us directly through WhatsApp or send us a message via the form.


© 2026 KD PRO - All rights reserved